Phase II of ship and sea equipment project in Rudong accelerates construction

The construction site of the second-phase expansion project of Yada Green Energy Solutions (Jiangsu). [Photo/WeChat account: rudongfb]
Construction gets underway on the second-phase expansion project of Yada Green Energy Solutions (Jiangsu), located in Rudong county of Nantong, Jiangsu province, which is expected to start operations this September.
The second-phase project covers 10.67 hectares and is a strategic upgrade of the first phase. On completion, it will have an annual production capacity of 15,000 metric tons of marine engineering modules and 300 sets of marine pipeline systems.
It will also achieve a significant transformation from conventional pipeline systems, smaller units and small pry blocks to the advanced manufacturing capabilities required for large-tonnage pipe galleries, modules and pipeline systems. These improvements are critical for the effective operation of floating production, storage and offloading (FPSO) vessels, as well as liquefied natural gas (LNG) carriers.
The company, a wholly owned subsidiary of Yada Green Energy Solutions in Zhejiang province, engages in the design and manufacturing of core supporting equipment, including LNG low-temperature pipes.



